That’s a monster battery any additional data on its build? How does it handle during a charge?
I got my beauty on the road sometime ago. However, temporary 52v 14s 10p pack built from batteryblocs. Just gathering the parts to build from cell holders a 14s 18p in two 7s blocks then later up to 21s.
I had washers/gaskets made via 3D print to extend the frame width. Hence 18p, does require a slight mod to extend the axle.
[youtube]https://www.youtube.com/watch?v=1a564v_2qQc&app=desktop[/youtube]
Scibomber420 said:
26s16p 30q vector pack.jpeg
Scibomber420 said:
Bg-electric-cycle said:
Anyone fitted 20s 20p within a Vector Typhoon frame. Actual fact fit 424 cells 20s 21p.
Only ask given I’d like some sort of metal containment. Either a complete box or half open one.
The cells in their holders appear a snug fit and unsure if the metal work of a box of does increase the size to a point were the ABC side wings be prevented from installation?
And yes, the blocks will have insulation between them.
26s16p. 96v 48ah 30q cells. Still a work in progress. Thought this might help. Biggest battery I was able to configure into my new vector typhoon frame.
I’m still in the process of getting everything fabricated for final assembly. It’s been a 5mo journey so far and it seem the more I work, the more projects I have and the ocd in me loves to overbuild things, so many of my original plans/ideas/designs/builds were scrapped numerous times until it felt right. I really enjoyed working in my jet ski and got used to trying to stick to the saltwater marine code of vehicle fabrication. The code on land is the minimum and the code in the ocean is the maximum.
Since I’m building this for my daily nyc commuter vehicle replacement and I don’t wana be fixing anything 200lbs outside of my house, AND this is my second ebike build (first is a mongoose boot’r 52v bbshd with a 600w 2.1 sound system “sub/component speakers/dsp/10s li ion”); I’m really taking my time on the new = 26s16/sab120amp/1200w 2.1 sound system build. I reality mostly waiting for the next round of packages to arrive and spend weeks building up, only to scrap/start over up to 5 times with each fabrication project so far.
I really believe to get the best product possible, First “DO NOT RUSH” and “u have to fail a few times in the process”, but take your time, don’t set deadlines and walk away sometimes to think or start another project in the meantime this will give ur brain time to compute all of the scenarios!
I don’t mean to preach, but enjoy the process and you’ll be amazed/proud of what we are all capable off!
I’m guna upload “pics only” of all of my progress so far on this vector build over this weekend and will keep u posted on the finished product too.