Recent content by aum

  1. A

    golden motor edge regen braking voltage setting for cycle analyst

    ok, after some time, internet digging, and trial & error / test rides, here is the answer to my own question: - for edge (golden motor magic pie 5) to do regenerative braking, edge controller needs to be wired to brake handle switch (e-switch, inside physical brake handle) so, if one is using...
  2. A

    Cycle Analyst V3 preview and first beta release

    olo i am troubleshooting regen braking with my 2 pcs golden motor magic pie 5 edge e-motors i surfed the web, only info i could find is: - for regen braking to work, battery has to be somehow empty - the speed has to be 10+ kmh (6.2 mph) i have my throttle connected to ca3.1(4) wp (8 wire plug)...
  3. A

    Cycle Analyst V3 preview and first beta release

    yea, but this only works uphill, downhill not at all. though i have not really tested it lol have fun aum
  4. A

    golden motor edge regen braking voltage setting for cycle analyst

    olo i have finished my trailer, which goes behind ice sprint tour trike i will be traveling the world right now i am troubleshooting my regen braking we have: - golden motor edge e-motors - 2 pieces, it does support regen braking - cycle analyst 3.1 (ca3) will do all the dirty work, including...
  5. A

    Magic Pie 4 with Cycle Analyst 3.0 - wheel not turning

    lol same happened to me
  6. A

    project e-trailer w solar charging - electrification phase

    lewtwo, thx for the reply yours is indeed (mp) v4 mine is (mp) edge v5 and, yes, all that silicone is a good, and me disturbing this internal zen protection, is a bad idea i have put aside the project, just over the weekend, contemplated a little, decided to 'try' to squeeze 3 thin, extra...
  7. A

    project e-trailer w solar charging - electrification phase

    hi i also need speed wire, connected to ca3.1 (wp), to measure the speeed 1 option is to draw / connect a hall sensor wire, directly from internal controller, in golden motor edge e-motor(s), but i have opened the e-wheel, took a look at the controller, and to draw an extra wire from the...
  8. A

    project e-trailer w solar charging - electrification phase

    hello i have 1) golden motor magic pie edge e-motor, 2 pcs 2) grin tech double shunt 3) grin tech cycle analyst 3.1 i need to connect all together: a) is this wiring correct ? b) do i need to connect the gnd & shunt-ve & shunt+ve (pin 2) to e-motor ground ? c) just green wire (pin 3 -...
  9. A

    How To Wire a 12V Brake Light and Turn Signals

    teklektik, many thanks for this thread of yours, superb, exactly what i needed. the link you mention is dead. is this equivalent / similar / good enough product (germany - eu)? https://www.ebay.de/itm/163180816430?hash=item25fe55a82e:g:r4MAAOSwE5xbYnX5 or this (china)...
  10. A

    project e-trailer w solar charging - electrification phase

    aah, good to know this, thank you, you made my day forward: using beech plywood, for solar panels back-plates (beech is strong, the rest not so, but they are lighter), i get: 2.5 m2 (square meters) of solar panels area (3 m2 with top 110 w panel) x 0.006 (for 6 millimeters plate thickness (=...
  11. A

    project e-trailer w solar charging

    here is link to electrification phase: https://endless-sphere.com/forums/viewtopic.php?p=1673365#p1673365 godspeed aum s love nia
  12. A

    project e-trailer w solar charging - electrification phase

    yea, i heard that this green little monster might come from few different china factories, consequently varying much in quality - some might work well for a long time, some others might not work, if at all, lol i can only hope, if mine breaks, that it breaks somewhere near the big city, so i...
  13. A

    project e-trailer w solar charging - electrification phase

    thx for the reply regarding "all ... in parallel" - i am a bit skeptical, because with each sunpower solar panel comes a small leaflet (safety & installation instruction), which hosts a small print, qoute: "... connecting panels in parallel .... additionally, if one of the panels were to go...
  14. A

    project e-trailer w solar charging - electrification phase

    ave, gratis plenum i am making an e-trailer with solar charging, here is link to design and making of pre-electrification phases: https://endless-sphere.com/forums/viewtopic.php?f=1&t=108424&p=1585634#p1585634 now i am the electrification phase, and have some questions, which, i decided, i...
  15. A

    project e-trailer w solar charging

    oj guys thank you all for your input currently (2021-08-26), i basically got to electrification, meaning i need to figure out how to mount solar panels, how to connect them together, then connect them to mppt solar charger controller, next to the battery, and cycle analyst, and rear lights...
Back
Top