RIPPERTON
100 W
CNC'ing the busbars and clamps. Also planning the battery management connections to the busbars.
Made a dummy end frame to se if it fits in the battery box. The first example didnt fit because the
box isnt perfectly straight all the way down, gets narrower so had to make the frame smaller.
Used the thread tapping machine to tap 200 threads in the clamp bars.
The red insulation tape on the busclamps stops chafing and props the bar out toward the tabs so the screws start easily.
Made a dummy end frame to se if it fits in the battery box. The first example didnt fit because the
box isnt perfectly straight all the way down, gets narrower so had to make the frame smaller.
Used the thread tapping machine to tap 200 threads in the clamp bars.
The red insulation tape on the busclamps stops chafing and props the bar out toward the tabs so the screws start easily.