I finally have all parts needed for my e-bike conversion.
I have the last 400 series Crystalyte hub motor that was in stock at Crystalyte Europe, a 408 front hub.
I'am ready to install it, but I like to do that with some assistance from forum members.
My previous discussion about what to buy: http://www.endless-sphere.com/forums/viewtopic.php?f=3&t=29696&hilit=mwhens.
First, the hardest part (I think) installing the hub motor on my alloy fork.
These are the parts I have for this job...
(I named all the parts for referrence)
First, the 408 front hub with 28"rim...
With the hub came these parts...
They advised me C washers, so I ordered them to...
And I have some extra parts, not sure why...
And the torque arms...
First of all, I can't find intructions.
Maybe someone knows a place where to find good instructions for installing the hub?
The first thing I needed to know, how to position the hub, cable left or right?
I found some picture, I believe when you are sitting on the bike, the hub cable is on the left side, correct?
For installing the hub, I at least need the C washer (I called C1 in the pictures).
The C washer filled the hole perfectly and create a flat area for a ring or bolt...
With still only a C washer, I can place the torque arm like this...
But I still have a ring and some kind of plate that came with the hub motor, don't know how or where to place them.
Also, when looking at the side, you see I don't have allot of axel length left for the bolt. And thats without those H2 and H3 parts (see pictures)...
I first need to know what parts I need, and where and in wich order to place them.
Any input is welcome
I have the last 400 series Crystalyte hub motor that was in stock at Crystalyte Europe, a 408 front hub.
I'am ready to install it, but I like to do that with some assistance from forum members.
My previous discussion about what to buy: http://www.endless-sphere.com/forums/viewtopic.php?f=3&t=29696&hilit=mwhens.
First, the hardest part (I think) installing the hub motor on my alloy fork.
These are the parts I have for this job...
(I named all the parts for referrence)
First, the 408 front hub with 28"rim...
With the hub came these parts...
They advised me C washers, so I ordered them to...
And I have some extra parts, not sure why...
And the torque arms...
First of all, I can't find intructions.
Maybe someone knows a place where to find good instructions for installing the hub?
The first thing I needed to know, how to position the hub, cable left or right?
I found some picture, I believe when you are sitting on the bike, the hub cable is on the left side, correct?
For installing the hub, I at least need the C washer (I called C1 in the pictures).
The C washer filled the hole perfectly and create a flat area for a ring or bolt...
With still only a C washer, I can place the torque arm like this...
But I still have a ring and some kind of plate that came with the hub motor, don't know how or where to place them.
Also, when looking at the side, you see I don't have allot of axel length left for the bolt. And thats without those H2 and H3 parts (see pictures)...
I first need to know what parts I need, and where and in wich order to place them.
Any input is welcome