torker
100 kW
I finally got my Turnigy watt meter. The manual says something about only switching the load side?? Any one have any recommendations about which wires to hook up first/last. Normally I would hook everything up and make the pos. battery connection last and also unhook the pos. first when disconnecting. I just don't want to fry it .