Eastwood
100 kW
- Joined
- Jan 13, 2021
- Messages
- 1,479
Looks like I will have this 72v battery and controller for about 2 months as 3Shul said at least 4-6 weeks for the controller. That will give me time to build the battery but waiting on the Molicel cells to come back in stock.
That being said I made my "temporary set up" more secure and safe as before the battery’s were just sitting on top of the motor lol
Made this bracket and bottom plate for the battery. Much more secure now, and will be able to hit some enduro trails now. Again this is just a temporary solution.
Should have wrapped the wood plate and cushions with gorilla tape to waterproof, guess I will do that tomorrow.
Also covered the batteries in some abs plastic to add some protection if I drop the bike. The plastic is not that thick but it’s better than nothing. Had all these materials laying around so put it to use.
That being said I made my "temporary set up" more secure and safe as before the battery’s were just sitting on top of the motor lol
Made this bracket and bottom plate for the battery. Much more secure now, and will be able to hit some enduro trails now. Again this is just a temporary solution.
Should have wrapped the wood plate and cushions with gorilla tape to waterproof, guess I will do that tomorrow.
Also covered the batteries in some abs plastic to add some protection if I drop the bike. The plastic is not that thick but it’s better than nothing. Had all these materials laying around so put it to use.